Re: crissy

From: Eyes4Hire@aol.com-DeleteThis.com
Date: Fri Apr 06 2001 - 09:06:26 PDT


X-OldHeader: From Eyes4Hire@aol.com-DeleteThis.com  Fri Apr  6 09:06:46 2001
Return-Path: <Eyes4Hire@aol.com-DeleteThis.com>
Received: from opus.labs.agilent.com (root@opus.labs.agilent.com-DeleteThis.com [130.29.244.179]) by jr.labs.agilent.com (8.9.3 (PHNE_18979)/8.9.3 AgilentLabs Workstation) with ESMTP id JAA08212 for <wind_talk_ls@jr.labs.agilent.com-DeleteThis.com>; Fri, 6 Apr 2001 09:06:46 -0700 (PDT)
From: Eyes4Hire@aol.com-DeleteThis.com
Received: from msgbas1t.cos.agilent.com (msgbas1t.cos.agilent.com [130.29.152.59]) by opus.labs.agilent.com (8.9.3 (PHNE_18979)/8.9.3 AgilentLabs Workstation) with ESMTP id JAA17001 for <wind_talk@opus.labs.agilent.com-DeleteThis.com>; Fri, 6 Apr 2001 09:06:46 -0700 (PDT)
Received: from imo-r12.mx.aol.com (imo-r12.mx.aol.com [152.163.225.66]) by msgbas1t.cos.agilent.com (Postfix) with ESMTP id 72D237C0 for <wind_talk@opus.labs.agilent.com-DeleteThis.com>; Fri,  6 Apr 2001 10:06:45 -0600 (MDT)
Received: from Eyes4Hire@aol.com-DeleteThis.com by imo-r12.mx.aol.com (mail_out_v29.14.) id v.3d.9e4e57a (4425) for <wind_talk@opus.labs.agilent.com-DeleteThis.com>; Fri, 6 Apr 2001 12:06:26 -0400 (EDT)
Message-ID: <3d.9e4e57a.27ff4382@aol.com-DeleteThis.com>
Date: Fri, 6 Apr 2001 12:06:26 EDT
Subject: Re: crissy
To: wind_talk@opus.labs.agilent.com-DeleteThis.com
X-Mailer: AOL 5.0 for Windows sub 128


 
> The iWindsurf chart for Crissy Thursday shows lulls at 10 MPH and gusts
> between 30 & 60 MPH (this URL may produce the graph:
> http://iwindsurf.zulusports.com/windandwhere.iws?regionID=11&
> geographicalAreaID=28&siteID=214&Isection=Last+5+Days).
>
> Was it really that radical out there?
>
> -jon

It was a little gusty, but not worse than average. It was filled all the way
into the beach. If it had been flooding it might have been a pain, but on
the ebb it was great and everyone was planing 100%. Remember, the sensor
tells you what is happening onshore near a building that dispurts the air
flow.

> > thursday was a great classic crissy day.
> >
> > Big ebb took me away from the pack and up to the bridge in 3 tacks,
> > smoother water up there. Other places had some brutal chop.
> >
> > Back at the parking lot things are settling down and looking good. Most
> > of the ropes have come down, and doggy bag dispensers are up.
> > I parked and rigged on grass, and rinsed off in fresh water.
> > Ghilotti Bros. have a bunch of heavy equipment there, looks like the
> > paved section next to the beach is being enlarged! There were 40-50
> > sailors out, and still room to park and rig.
> >
> > it's been a long a time commin.
> > Bob

I think from end to end we'll get nearly 100 new spaces from the 20' paved
strip that will run the length of the beach. It should take about two weeks
to finish if all go well.

Peter



This archive was generated by hypermail 2b29 : Mon Jan 07 2002 - 02:10:09 PST